Real JME Engineering Evidence

JME Projects & Case Studies

Selected industrial EMS, SCADA, energy monitoring and hybrid-power integration projects by JME Energy & Automation. Where JME worked through another contractor, the role is stated accurately as sublet integration work.

Explore project evidence

Use the engineering areas to move from real project proof to the relevant solution, technology and next technical step.

Punjab Assembly SyncGen SCADA showing solar, generator and power system monitoring

Punjab Assembly — SCADA & Energy Monitoring

Solar-inverter, generator, transformer-side and power-system data integrated into one SyncGen SCADA environment, including fiber-optic communication between remote equipment and the main power room.

View Case Study →

Parliament House live SyncGen solar monitoring screen showing the installed SCADA system in operation

Parliament House — Solar Monitoring & SCADA

Mixed-vendor solar monitoring and SCADA integration combining newer and legacy inverter systems, with dedicated metering used where direct equipment data was unavailable.

View Case Study →

SolarEast 215 kWh BESS with Huawei solar grid genset and SYNCGEN EMS monitoring in Pakistan

SolarEast 215 kWh BESS + Huawei Solar + Genset + Grid — Pakistan EMS Project

JME integrated a SolarEast 215 kWh BESS, 100 kW Huawei on-grid solar system, 100 kVA genset and WAPDA/grid supply into one SYNCGEN EMS environment for coordinated monitoring, peak shaving, valley filling and energy control in Pakistan.

View Case Study →

Sazgar Engineering Works unified SCADA and EMS integrating approximately 5 MW solar, WAPDA, synchronized generators, load management and weather monitoring

★ Primary Flagship Project · Phase IV

Sazgar Engineering Works — HAVAL / GWM Pakistan Car Plant

JME’s largest flagship integration brings unified SCADA and EMS, approximately 5 MW solar coordination, synchronized generators, WAPDA coordination, automatic load management, VCB operations and weather-station monitoring into one industrial operating environment.

View the Sazgar flagship case study →

UNICEF Quetta hybrid energy project integrating SYNCGEN EMS, weather station, Sofar on-grid solar, GoodWe hybrid inverters, batteries, WAPDA and generators

Featured Institutional Project · Quetta, Pakistan

UNICEF Quetta — Hybrid Energy, SYNCGEN EMS & Weather Station

JME integrated WAPDA, two generators, 100 kW Sofar on-grid solar, GoodWe hybrid inverters, battery storage, dynamic export control and a complete weather station through one SYNCGEN EMS operating environment. During WAPDA operation the configured solar window can remain open; during generator operation solar contribution is limited according to the generator-loading and reverse-power control philosophy.

View the UNICEF Quetta featured case study →

Engineering Areas Represented

These projects demonstrate JME’s work across industrial energy management systems, SCADA and centralized control, industrial energy monitoring, genset synchronization and load sharing, BESS integration, hybrid-energy control, retrofit engineering and FAT, SAT and commissioning.

FIELD EVIDENCE · NOT FORECASTED SAVINGS

Engineering outcomes documented in operating plants

System capacity, monitoring coverage and implemented control are engineering facts—not automatically fuel savings or guaranteed payback.

Request an Engineering Review of a Similar System →

Sazgar customized unified SCADA and EMS screen showing industrial energy sources and generator monitoring

Sazgar Engineering

3 gensets synchronized · approximately 5 MW solar integration context

Unified SCADA/EMS visibility and coordinated generator control. No independently verified fuel-savings percentage is presented.

Review Sazgar engineering evidence →
Ghani Chemicals Hattar dual-utility zero-export control and source-load monitoring evidence

Ghani Chemicals Hattar

2 utility feeders · monitored solar and plant load trends

Implemented source-specific zero-export monitoring and control. Penalty avoidance or recovered energy is not quantified without meter records.

Review Ghani control evidence →

How JME Documents Project Evidence

Each case study separates the client’s operating requirement, installed equipment, integration challenge, JME engineering scope and observable system outcome. Equipment ratings and operating values are presented only where project records or field evidence support them. Where JME worked through a contractor or procurement partner, the delivery role is stated clearly. This evidence-led structure helps industrial teams compare relevant experience in EMS, SCADA, BESS, solar, generators, energy monitoring and retrofit work without relying on unsupported marketing claims. It also provides a practical route from completed project evidence to the corresponding engineering service, allowing plant owners, consultants and EPC teams to assess technical fit before requesting a system review.

Explore SYNCGEN EMS →