Real JME Engineering Evidence
JME Projects & Case Studies
Selected industrial EMS, SCADA, energy monitoring and hybrid-power integration projects by JME Energy & Automation. Where JME worked through another contractor, the role is stated accurately as sublet integration work.
Use the engineering areas to move from real project proof to the relevant solution, technology and next technical step.

Punjab Assembly — SCADA & Energy Monitoring
Solar-inverter, generator, transformer-side and power-system data integrated into one SyncGen SCADA environment, including fiber-optic communication between remote equipment and the main power room.

Parliament House — Solar Monitoring & SCADA
Mixed-vendor solar monitoring and SCADA integration combining newer and legacy inverter systems, with dedicated metering used where direct equipment data was unavailable.

SolarEast 215 kWh BESS + Huawei Solar + Genset + Grid — Pakistan EMS Project
JME integrated a SolarEast 215 kWh BESS, 100 kW Huawei on-grid solar system, 100 kVA genset and WAPDA/grid supply into one SYNCGEN EMS environment for coordinated monitoring, peak shaving, valley filling and energy control in Pakistan.

★ Primary Flagship Project · Phase IV
Sazgar Engineering Works — HAVAL / GWM Pakistan Car Plant
JME’s largest flagship integration brings unified SCADA and EMS, approximately 5 MW solar coordination, synchronized generators, WAPDA coordination, automatic load management, VCB operations and weather-station monitoring into one industrial operating environment.

Featured Institutional Project · Quetta, Pakistan
UNICEF Quetta — Hybrid Energy, SYNCGEN EMS & Weather Station
JME integrated WAPDA, two generators, 100 kW Sofar on-grid solar, GoodWe hybrid inverters, battery storage, dynamic export control and a complete weather station through one SYNCGEN EMS operating environment. During WAPDA operation the configured solar window can remain open; during generator operation solar contribution is limited according to the generator-loading and reverse-power control philosophy.
Engineering Areas Represented
These projects demonstrate JME’s work across industrial energy management systems, SCADA and centralized control, industrial energy monitoring, genset synchronization and load sharing, BESS integration, hybrid-energy control, retrofit engineering and FAT, SAT and commissioning.
FIELD EVIDENCE · NOT FORECASTED SAVINGS
Engineering outcomes documented in operating plants
System capacity, monitoring coverage and implemented control are engineering facts—not automatically fuel savings or guaranteed payback.
Request an Engineering Review of a Similar System →
How JME Documents Project Evidence
Each case study separates the client’s operating requirement, installed equipment, integration challenge, JME engineering scope and observable system outcome. Equipment ratings and operating values are presented only where project records or field evidence support them. Where JME worked through a contractor or procurement partner, the delivery role is stated clearly. This evidence-led structure helps industrial teams compare relevant experience in EMS, SCADA, BESS, solar, generators, energy monitoring and retrofit work without relying on unsupported marketing claims. It also provides a practical route from completed project evidence to the corresponding engineering service, allowing plant owners, consultants and EPC teams to assess technical fit before requesting a system review.