Industrial BESS Design & ROI Calculator
Assess preliminary battery capacity, PCS power and project economics using your own load, tariff and equipment assumptions. Compare estimated payback, NPV and IRR, with transparent sizing methods and downloadable results.
Start BESS Feasibility →Project assumptions
Project details
1. Duty & load
2. Battery & PCS
3. Tariff & generator
4. CAPEX & finance
5. Electrical interface
Transparent engineering, not a black box
Usable MWh
Delivered AC energy is converted to nominal DC battery energy using the entered usable DoD and one-way discharge efficiency, then rounded up to the selected block/container size.
PCS & C-rate
PCS follows the discharge duty plus margin. Battery MWh is then sized to satisfy both the discharge-duration requirement and the entered continuous C-rate limit at PCS nameplate.
Tariff + MDI + genset
Energy spread, demand-charge reduction and optional generator displacement remain separate so double counting is easier to spot.
Independent references behind the calculation approach
These references support the engineering terminology, performance metrics, lifecycle treatment and BESS integration methodology used by this screening calculator. They do not validate individual project results or prescribe tariffs, CAPEX or equipment assumptions. No sample values are provided; enter actual site, tariff, cost and OEM data.
Battery degradation, replacement and financial modelling
NREL battery modelling work explicitly treats capacity fade, scheduled battery replacement and replacement CAPEX over the analysis period. NREL techno-economic studies also distinguish battery energy, power and AC round-trip efficiency assumptions.
NREL battery techno-economic modelling · NREL BESS assumptions example
Measured BESS performance and efficiency
DOE/FEMP guidance evaluates deployed BESS using actual charge/discharge data and key performance indicators. DOE/Sandia performance protocols identify metrics including round-trip efficiency, energy capacity, response and power factor.
Design, operation and maintenance of BESS
IEEE 2030.2.1 provides guidance for stationary BESS integrated with electric power systems, including connection, design, operation, maintenance and associated engineering considerations.
Performance testing and duty-cycle framework
IEC TS 62933-2-2 defines application and performance testing methods and duty cycles for electrical energy storage systems. Final project safety and compliance must also follow the applicable IEC 62933 safety standards, local grid codes and OEM requirements.
From BESS sizing to project integration
Use these estimates as a starting point for a site-specific engineering review. Explore JME’s BESS and EMS integration services for equipment interfaces, solar and genset coordination, commissioning and handover.