Category: Engineering Insights

Practical industrial energy, PV–genset, BESS, SCADA and automation engineering insights from JME Energy & Automation.

  • Why Solar PV Becomes a Problem When Diesel Generators Are Running

    A factory can have a perfectly healthy solar plant and perfectly healthy diesel generators—and still develop an unstable power system when the two are asked to operate together.

    The problem is usually not “solar versus generator.” It is coordination. Industrial load can change in seconds, while PV output and generator loading must remain inside safe operating limits.

    Need to operate an existing solar plant with diesel generators? Review JME’s industrial PV–genset controller integration service for equipment checks, generator-loading limits, retrofit considerations and a site-specific engineering review.

    What the operator sees

    Typical symptoms include generators running too lightly loaded, reverse-power alarms, inverter trips, sudden PV curtailment, unstable transitions, or operators manually switching solar off whenever generators start.

    The engineering problem

    Imagine an industrial load of 700 kW. The generator is supplying 500 kW and solar is supplying 200 kW. If production suddenly falls by 250 kW, total demand becomes 450 kW. Without coordinated control, the PV plant may continue producing while generator loading collapses. Depending on the architecture, this can create minimum-loading or reverse-power conditions.

    A PV–genset controller is a power-balancing controller

    The controller continuously measures the electrical system, determines which sources are online, calculates how much PV can safely operate, and sends an active-power limit to the solar inverter system. The objective is not simply to switch solar ON or OFF; it is to keep the complete plant inside an engineered operating envelope.

    The basic control loop

    • Measure generator, solar and load power.
    • Identify the active operating mode.
    • Maintain the configured minimum generator loading/reserve.
    • Calculate permitted PV power.
    • Apply PV curtailment when required.
    • Verify inverter response and raise an alarm if control is lost.

    Real JME field case: an existing export controller was installed—but export was still occurring

    At an industrial solar site, an export-control system was already installed, yet unwanted grid export still appeared during actual operation. JME did not start by guessing a new setting. We installed our own monitoring/control device and observed solar production, plant load, grid power flow, voltage, current and sudden load variations over multiple operating cycles. Based on the measured behaviour, we established practical setpoints and operating margins, fine-tuned the response, and monitored it again before handover. The unwanted export was successfully curtailed while minimizing unnecessary loss of usable solar generation. Read the complete Solar Export Limit / Zero Export engineering service →

    Why a zero-export device alone may not solve it

    Zero export and PV–DG coordination solve different control problems. A grid zero-export scheme normally limits power flowing toward the utility. During generator operation, the controller also has to protect generator operating limits and react to changes in generator availability and plant load.

    Communication matters as much as the algorithm

    A practical system may communicate with energy meters, generator controllers and solar inverters over Modbus RTU/TCP or other supported interfaces. Register mapping, scaling, communication-loss handling and safe fallback behaviour are part of the engineering—not afterthoughts.

    JME field note

    For industrial projects, we prefer to start with the single-line diagram, source capacities, generator minimum-loading requirement, CT/meter locations, inverter control capability and operating scenarios. The control philosophy should be agreed before commissioning begins.

    For a deeper technical overview, see JME’s PV–Genset Controller & PV–Diesel Hybrid Control engineering page and our project evidence and case studies.

    PV–DG CONTROL IN ONE VIEW

    Generator kW + Solar kW → Industrial Load → PV–DG Controller → PV Power Limit. The controller continuously recalculates the safe PV contribution as plant load and generator availability change.

    Technical references

    For primary technical reference, see Deep Sea Electronics DSE8610 MKII official product downloads, Huawei’s active-power control documentation.

    Engineering note: Exact inverter registers, generator minimum-loading limits and protection settings are equipment- and project-specific. Verify them against manufacturer documentation and the site’s approved control philosophy.

    What we will cover next

    Next in this engineering series: minimum generator loading, reverse power, inverter active-power control, CT placement, multi-genset operation, communication failures and practical commissioning tests.